水泥罐倉除塵器怎么安裝?

來源:http://m.tourongquan.cn/ 發布時間:日期:2025-05-09 1

一、安裝前準備工作

1、 Preparation work before installation

設備選型核查

Equipment selection verification

在安裝前必須嚴格核對除塵器型號規格與水泥罐倉的匹配性,包括處理風量、過濾面積等關鍵參數,確保設備性能滿足工況需求。同時需檢查設備外觀是否完好,內部濾袋等核心部件有無運輸損傷。

Before installation, it is necessary to strictly check the compatibility between the dust collector model and specifications and the cement tank compartment, including key parameters such as processing air volume and filtration area, to ensure that the equipment performance meets the requirements of the working conditions. At the same time, it is necessary to check whether the appearance of the equipment is intact and whether there is any transportation damage to the core components such as the internal filter bag.

工具材料準備

Preparation of tools and materials

安裝需配備完整的工具套裝:包括不同規格的扳手套裝(8-19mm)、電動螺絲刀、水平儀、密封膠槍等專業工具。材料方面需準備耐高溫密封膠、304不銹鋼螺栓組(含平墊彈墊)、防爆電氣接線端子等。

Installation requires a complete set of tools, including wrench sets of different specifications (8-19mm), electric screwdrivers, level gauges, sealant guns, and other professional tools. In terms of materials, it is necessary to prepare high-temperature resistant sealant, 304 stainless steel bolt sets (including flat pads and spring washers), explosion-proof electrical wiring terminals, etc.

現場環境準備

On site environment preparation

安裝區域需進行徹底清理,使用工業吸塵器清除罐倉頂部積塵。設置隔離警戒區,避免交叉作業影響安裝質量。準備防雨防塵臨時遮擋設施,確保安裝過程不受天氣影響。

The installation area needs to be thoroughly cleaned, using an industrial vacuum cleaner to remove dust from the top of the tank compartment. Set up isolation and warning areas to avoid cross operation affecting installation quality. Prepare temporary shelter facilities for rain and dust prevention to ensure that the installation process is not affected by weather.

二、安裝流程

2、 Standardized installation process

定位測量

Positioning measurement

采用全站儀進行精確定位,根據罐倉結構CAD圖紙確定除塵器安裝坐標。需考慮檢修空間要求(建議保留≥800mm環形通道),并避開倉頂安全閥等關鍵部件。

Using a total station for precise positioning, determine the installation coordinates of the dust collector based on the CAD drawings of the tank structure. Consider the maintenance space requirements (it is recommended to retain a circular channel of ≥ 800mm) and avoid key components such as the safety valve on the top of the warehouse.

c90922efbf6c2b6.jpg

支架安裝

Bracket installation

選用δ=8mm碳鋼支架,采用M16化學錨栓固定。安裝時使用激光水平儀校準,水平度偏差需控制在3‰以內。焊接部位需做防銹處理,并完成24小時承重測試。

Choose a carbon steel bracket with δ=8mm and fix it with M16 chemical anchor bolts. During installation, a laser level should be used for calibration, and the horizontal deviation should be controlled within 3 ‰. The welding area needs to undergo rust prevention treatment and complete a 24-hour load-bearing test.

管道連接

Pipeline connection

(1)進氣管道采用法蘭連接,石棉墊片需做浸油處理

(1) The intake pipeline adopts flange connection, and the asbestos gasket needs to be treated with oil immersion

(2)出風管道安裝膨脹節補償熱位移

(2) Installation of expansion joints to compensate for thermal displacement in the air outlet duct

(3)所有接口需進行氣密性檢測(0.05MPa保壓測試)

(3) All interfaces need to undergo air tightness testing (0.05MPa pressure holding test)

主體安裝

Main installation

吊裝時使用專用平衡梁,就位后采用扭矩扳手緊固螺栓(扭矩值參照GB/T3098.1)。最終檢測垂直度偏差≤2mm/m。

Use a dedicated balance beam during lifting, and tighten the bolts with a torque wrench after positioning (torque values refer to GB/T3098.1). The final verticality deviation is ≤ 2mm/m.

電氣安裝

Electrical installation

(1)按IEC標準敷設阻燃電纜

(1) Lay flame-retardant cables according to IEC standards

(2)防爆區域需使用ExdⅡBT4等級電器元件

(2) Explosion proof areas require the use of Exd Ⅱ BT4 grade electrical components

(3)接地電阻測試值≤4Ω

(3) Grounding resistance test value ≤ 4 Ω

本文由倉頂除塵器友情奉獻.更多有關的知識請點擊:http://m.tourongquan.cn我們將會對您提出的疑問進行詳細的解答,歡迎您登錄網站留言.

This article is a friendly contribution from the pneumatic conveying system For more information, please click: http://m.tourongquan.cn We will provide detailed answers to your questions. You are welcome to log in to our website and leave a message

相關產品 / Related products

  • 氣動雙插板閥

    氣動雙插板閥

  • 氣動雙插板閥

    氣動雙插板閥

  • 氣動雙插板閥

    氣動雙插板閥

  • 氣動擺動閥

    氣動擺動閥

2024  濟南鑫魯泉盛機械設備有限公司     備案號:魯ICP備18012408號-3  魯公網安備37018102000806號

主站蜘蛛池模板: 欧美成人性色生活片免费在线观看 | 婷婷亚洲综合一区二区 | 免费观看亚洲 | 成年看片免费高清观看 | 午夜毛片福利 | 亚洲精品动漫一区二三区在线观看 | 手机日韩 | 中文欧美日韩 | 国产一区二区三区在线观看精品 | 日本一级一片免在线观看 | 国产三级不卡 | 精品国产免费一区二区三区 | 日本免费一区二区三区视频 | 你懂得的在线观看免费视频 | 欧美日韩一本大道香蕉欧美 | a级毛片免费高清毛片视频 a级毛片免费高清视频 | 黄网站色在线视频免费观看 | 中文字幕在线观看亚洲日韩 | 最近中文字幕完整在线看一 | 欧美成人性色生活片天天看 | 欧美色图日韩 | 成人a毛片在线看免费全部播放 | 一级毛片在线直接观看 | 福利在线国产 | 男人懂得网站 | 国产成人啪午夜精品网站 | 亚洲欧美日韩精品专区卡通 | 日本免费观看视频 | 欧美视频在线观看 | 午夜看一级特黄a大片黑 | 日本高清不卡一区 | 日产精品一卡2卡三卡4乱码久久 | 亚洲欧洲综合网 | 免费的成人a视频在线观看 免费的黄色毛片 | 手机在线看片国产日韩生活片 | 免费一级毛毛片 | 欧美视屏在线观看 | 日韩一级片在线观看 | 真正全免费视频a毛片 | 色奇吧亚洲国产成人精品 | 求网址你懂的手机在线观看网站 |